‘1st chip from Tata’s Dholera plant by 2026’

Mar13,2024



Ahmedabad: Union Electronics and Information Technology Minister Ashwini Vaishnav was the first to say Piece From Tata Electronics, Dholera The plant will be ready in 2026. Vaishnav said this during a media briefing in Dholera on Wednesday after the company's foundation stone laying ceremony with Gujarat CM Bhupendra Patel. semiconductor fab unit In Dholera.
Tata Group is setting up India's first semiconductor fab unit at a cost of Rs 91,000 crore in Dholera, which has been declared a Semicon city. The Center will contribute 50% of the capital expenditure on pari passu basis.
“The chips from the Micron plant will arrive by December this year. India will be among the top five chip ecosystems in the world by 2029,” the minister said. Tata Sons Chairman N Chandrasekaran said, “We are accelerating the timeline and expect to go live in 2026. Typically, a fab takes about four years to set up. We aim for commercial production in late 2026.” Manufacturing has to start.”



Related Post

Leave a Reply

Your email address will not be published. Required fields are marked *